Greenfield Sewer System Rehabilitation – Rebid – December 2025
The project includes point/joint repair and CIPP and Post CCTV. Point repair will require the restoration of State Routes 54 and 124 including paving.
Addenda
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| Addendum 1 | 203.6 KB | |||
| Addendum 2 | 538.1 KB |

